top of page
THE BRIEF
We need to go low key this time as we are at full capacity production wise and have sold everything for the next year or so. We have been to successful! We do need however to keep in touch with our clients so it’s a meet and greet operation this time around.
THE DESIGN
Opting to send both the structures along with the entire build out from the UK not only provided a great design that we could keep total control of the quality but saved very considerable costs for the client as US Las Vegas contractors are very, very expensive to work with. This cost control aspect was especially welcomed.
bottom of page